Menu OLFO Contact
A slim linear air slot set into a plaster ceiling above oak wall panelling, warm light grazing the surfaces

Our Approach · Stage 06 of 07

Technical Coordination & Commissioning

Bringing the fragrance into the architecture.

A fragrance may be developed with a particular room in mind, but its successful introduction depends on the building’s practical realities. Behind the finished surfaces of an interior are ventilation systems, electrical services and the routines that keep a property running. Adding fragrance means understanding these arrangements and working closely with the people responsible for them.

At this stage, the agreed diffusion design is translated into a practical installation plan, with attention to how the system will operate within the building over time.

Coordination with the Project Team

A fragrance system is rarely installed in isolation from other building services.

Depending on the property, coordination may involve architects, interior designers, building-services engineers, specialist contractors and the team responsible for daily operations.

Equipment has to suit its surroundings and remain easy to service. Electrical connections, ventilation arrangements and operating schedules all influence the final installation approach.

Where fragrance is to be introduced through an HVAC system, the proposed connection requires assessment by the relevant building-services professionals. Air distribution, system compatibility and the existing ventilation design must be checked before installation goes ahead.

This coordination makes sure the fragrance system fits in without disrupting how the building already works.

Commissioning in the Space

Then comes the first time the fragrance is experienced in its real setting.

A composition assessed in a sample and a diffusion approach planned on a drawing must now be experienced within the actual building. Air moves differently through individual rooms, and the way a space is occupied may reveal conditions that were less apparent during planning.

Where commissioning forms part of the agreed project, the installed system can be reviewed under representative operating conditions.

This may involve assessing fragrance intensity across the agreed zones, observing how it travels between adjoining areas and checking whether the operating settings suit the way the property is used.

Any necessary adjustments can then be identified in consultation with the relevant project team.

The result should be practical for the property and true to the olfactory experience agreed at the start.

Related

HVAC Integration→For Architects & Designers→

A conversation about your space.

Tell us a little about the place and where the project stands. We can begin from there.

Discuss technical requirements